Kitchens and bathrooms are the hardest-working rooms in any Dubai home. They also involve the most trades: plumbing, electrical, waterproofing, tiling, joinery and glass. That is why a kitchen and bathroom renovation in Dubai needs more planning than a simple refresh. This guide walks through the key decisions in the order you will face them.

Part 1: Kitchen renovation

Start with the layout

Think about how you cook and move. The classic “work triangle” between sink, hob and fridge still works well, but in many Dubai apartments a single wall or L-shaped kitchen with an island or peninsula makes better use of space. Moving the sink or hob is possible, but it adds plumbing, drainage and electrical work, and some buildings limit changes to gas or drain positions.

Choose materials that handle heat and humidity

Plan lighting, sockets and ventilation

Add under-cabinet lighting, enough sockets on the worktop and a properly ducted cooker hood. Any new circuits should be installed by a licensed electrician in line with DEWA regulations.

Refresh or replace?

If your cabinets are solid and the layout works, cabinet wrapping plus a new worktop can transform the kitchen at a fraction of the cost. If storage and layout are the problem, a full kitchen renovation is the better investment.

Part 2: Bathroom renovation

Waterproofing comes first

Most bathroom problems in Dubai, such as ceiling stains in the flat below or hollow tiles, come from poor waterproofing. A proper job includes a membrane on the floor and shower walls, reinforced corners and drain collars, and a flood test of 24–48 hours before tiling. Read more on our waterproofing page.

Showers, tubs and glass

Walk-in showers with frameless glass screens are the most requested upgrade. The floor must slope correctly to the drain inside the enclosure. In UAE stores, ready-made shower screens start around AED 550, while custom frameless glass is measured on site. See our glass and aluminium service.

Tiles and fixtures

Use matte, anti-slip tiles on floors and larger-format porcelain on walls for fewer grout lines. Concealed cisterns and wall-hung toilets save space and are easier to clean around. Choose taps and mixers that handle scale from desalinated water.

Ventilation and lighting

An extractor fan vented properly prevents mould and peeling paint. Use moisture-rated light fittings and RCD-protected circuits.

Timelines

A kitchen refresh with wrapping and a new worktop may take a week or two. A full kitchen or bathroom renovation usually takes several weeks, including demolition, first-fix plumbing and electrical, waterproofing, tiling, joinery and finishing. Approvals from building management can add time, so include them in your plan.

What affects the cost?

For trade-by-trade price ranges, see our renovation cost guide. When you are ready, book a free site visit and we will send a fixed, itemised quote for your bathroom renovation or kitchen project.

Leave a Reply

Your email address will not be published. Required fields are marked *